EV Charger Installation & Grid Integration

World-class electrical and civil installation services delivering robust AC destination chargers, ultra-fast DC stations, and high-voltage grid substations.

Compliant, Safe, and Fast-Track Turnkey Delivery

EV infrastructure demands stringent adherence to safety standards. Our certified electrical engineering teams coordinate closely with PLN to ensure rapid energization, certified SLO (Sertifikat Laik Operasi), and compliance with Indonesian PUIL/SNI standards.

Official SLO & Regulatory Licensing

Complete management of Ministry of Energy and Mineral Resources (ESDM) and PLN SPKLU operational permits.

Transformer & Substation Upgrades

Turnkey engineering of medium-voltage switchgear, dedicated transformers, and surge protection.

Complete Civil Works & Architectural Branding

Concrete foundations, weather canopies, bollards, wheel stops, and high-visibility epoxy ground marking.

Request Engineering Site Survey
Certified EV Charger Installation Engineering
Installation Process Phases
  1. Phase 1: Engineering Site Survey
    Load capacity analysis, transformer distance, and CAD layout.
  2. Phase 2: PLN Permitting & Power Allocation
    Substation coordination and dedicated tariff registration.
  3. Phase 3: Civil Construction & Cabling
    Trenching, conduits, concrete pad foundations, and canopies.
  4. Phase 4: Commissioning & SLO Testing
    Full insulation resistance testing, live load run, and cloud CMS connection.